Transource power line route. Transource Energy combine...
Transource power line route. Transource Energy combines the unique capabilities of American Electric Power and Great Plains Energy to develop, build, own and operate competitive electric transmission projects. PJM Interconnection, the regional transmission organization for Pennsylvania, approved the Transource Project in 2016. In October 2019, Transource filed a new scaled-back route that would no longer have affected those properties, instead expanding the size of the Furnace Run substation, constructing 4 miles of new line in that vicinity, rebuilding portions of existing lines and utilizing some existing structures instead of new infrastructure. AEP’s competitive transmission affiliate is Transource Energy, LLC. More than 300 miles of new 765‑kV lines will boost grid reliability and support economic growth in central Ohio after PJM approved the project Feb. If this project is approved by the West Virginia PSC, the state will use powers of eminent domain. Transource Energy announced its preferred routes in Franklin and York counties for a high-power electric transmission line. Transource Energy, Dominion Energy and FirstEnergy contend the incentives are needed to reduce the project’s risks. Tell the Pennsylvania Public Utility Commission (PUC) NO To Transource Energy’s Independence Energy Connection. The Sooner-Wekiwa Project involves: An electricity transmission line in Franklin County that has faced opposition since 2018 got a green light from the county, which struck a $9 million deal to allow Transource to build the line After several months of "public input," Transource LLC has finalized the route for their proposed 230kV high voltage transmission line through York and Harford Counties. The lines will be engineered to be capable of carrying twice the power of a normal 500kv line. The Joshua Falls-Yeat Transmission Line, a $1 B venture by Valley Link – a joint venture of Dominion Energy, FirstEnergy Transmission, LLC, and Transource Energy, LLC – will operate at 765 kV, the highest-capacity lines in the state and nation. PUC says Transource is a utility. to Md. May 7, 2025 · May 7, 2025 SPP board selects Transource to construct $72 million Oklahoma transmission project Southwest Power Pool’s (SPP) board of directors approved an industry expert panel (IEP) recommendation for Transource Oklahoma, LLC with Transource Energy, LLC to build the Mathewson-to-Redbud transmission project. Mathewson–Redbud Transmission Line Project Mathewson–Redbud Transmission Line Project The Southwest Power Pool (SPP), the regional transmission operator who oversees the power grid across 14 states, mandated this project to relieve congestion on the power grid in and around Oklahoma City. Transource Energy filed PJM Interconnection, the regional transmission organization for Pennsylvania, approved the Transource Project in 2016. After considering several alternative projects, SPP awarded this project to Transource through a Matthewson - Redbud Project Mathewson - Redbud Project Transource Energy, a partnership between American Electric Power and Evergy, plans to build approximately 40 miles of 345-kilovolt transmission line between the Oklahoma Gas & Electric (OG&E) Mathewson Substation in Piedmont and the OG&E Redbud Energy Facility in Luther, Oklahoma. Communities are made up of people and the infrastructure that supports their daily lives. An electricity transmission line in Franklin County that has faced opposition since 2018 got a green light from the county, which struck a $9 million deal to allow Transource to build the line HARRISBURG -- Transource Energy has submitted to regulators its planned routes for high-voltage electric transmission lines in Franklin County and southern York County. Stop Transource Franklin County is a group of concerned citizens working to stop the Transource Independence Energy (IEC) Power Line Project from being approved and built through the center of Franklin County. Evergy owns 13. The Sooner-Wekiwa Project Transouce gets first approval for high-voltage power line plan in York and Franklin counties. The Southwest Power Pool (SPP) awarded Transource the opportunity to construct an electric transmission line in Oklahoma to address deficiencies in the electric grid and improve consumer access to low-cost power. 7 billion in transmission system upgrades to improve reliability and increase power availability in states throughout the PJM footprint including Indiana, Maryland, Ohio, Virginia, and West Virginia. Aug 30, 2024 · An electricity transmission line in Franklin County that has faced opposition since 2018 got a green light from the county, which struck a $9 million deal to allow Transource to build the line Jan 7, 2026 · A joint venture between Transource Energy, LLC and BHE Transmission plans to build a nearly 200 mile, 765-kV line in Wisconsin following selection by the Midcontinent Independent System Operator (MISO). SPP’s board of directors has approved a recommendation from the Industry Expert Panel (IEP) for Transource Oklahoma, LLC and Transource Energy, LLC, to build the Mathewson-to-Redbud transmission The Transource team is excited to put our unmatched decades of experience in 765-kV transmission line development to work as we build the lines that will provide reliable and affordable power to In February 2017, a company called Transource proposed building a high-power transmission line through southern York and Franklin counties, citing the need to meet electricity demands in the The Southwest Power Pool (SPP) awarded Transource the opportunity to construct a new electric transmission line in Oklahoma to address deficiencies in the electric grid and improve consumer access to low-cost power. This 230 Kv IEC Project is not needed, nor wanted, and is destructive to York and Franklin Counties in Pennsylvania An Ohio-based utility company, Transource Energy, plans to take 45 miles of serene countryside in southern Pennsylvania into northern Maryland for an overhead power The fight isn't over yet for opponents of Transource's proposed high-voltage power line. AEP owns 86. COLUMBUS - PJM Interconnection has approved a major electric transmission project for central Ohio aimed at addressing growing power demands in the Columbus region, according to a press release This project, developed by Transource Energy and FirstEnergy Transmission through Grid Growth Ventures, will involve approximately 300 miles of new 765-kilovolt lines and upgrades to several Welcome to Jersey Central Power & Light Need help with your electric bill? Get the support you need. COLUMBUS, Ohio, Nov. 4, 2021 — Transource Energy, a partnership between American Electric Power (Nasdaq: AEP) and Evergy (NYSE: EVRG), today announced the final line route for the Sooner-Wekiwa Project, a new electric transmission line in Oklahoma designed to save customers hundreds of millions of dollars in the coming years. Within the year, Stop Transource–a group of landowners, citizens, and community leaders–formed with a goal of opposing the Transource Project at the Pennsylvania Public Utility Commission (PA PUC). Transource on Wednesday Developed by Valley Link—a joint venture between Dominion Energy, Transource (jointly owned by American Electric Power and Evergy) and FirstEnergy Transmission — the Joshua Falls–Yeat 765 kV Electric Transmission Line Project represents a collaborative, forward-looking solution to help address the region’s rapidly growing demand for Franklin County commissioners, who had opposed the project, struck a $9 million deal to allow Transource to build the line. S. Dominion Energy, American Electric Power Company (AEP) through its Transource Energy affiliate, and FirstEnergy Transmission LLC (FirstEnergy) will jointly develop the projects across multiple states within the PJM footprint under the recently-formed Valley Link Transmission Company, LLC joint venture. – The Franklin County Good Wolf Treatment Court will celebrate the program’s 45th and 46th graduates during a special ceremony on Oct. 6 million customers in 11 states. AEP is committed to improving our customers' lives with reliable, affordable power. 12. Transource understands the Transource Energy promotes jobs and economic benefit of electric transmission lines in Franklin and York counties. 5% of Transource. An electricity transmission line in Franklin County that has faced opposition since 2018 got a green light from the county, which struck a $9 million deal to allow Transource to build the line Franklin County Treatment Court Plans Graduation Ceremony For Oct. . — that is if or when Transource Energy clears several regulatory hurdles. Mission Statement: "The Goal of STOP Transource Power Lines MD, Inc. Transource Energy is a partnership between American Electric Power (Nasdaq: AEP) and Evergy focused on the development and investment in competitive electric transmission projects across the U. More: Landowners, Transource meet in York County Court over power line project More: PUC schedules Transource powerline public input hearings More: York County recommends PUC deny Transource power YORK COUNTY, Pa. Jointly developed by Transource Energy, LLC (a. Regional grid operator PJM Interconnection has selected a major electric transmission project to meet a critical infrastructure need in central Ohio. American Electric Power and its competitive transmission affiliate Transource Energy will invest approximately $1. , Pa. Power flow results have confirmed that the Transource project does indeed solve identified 2023 overloads on a 500 kV line, a 500/230 kV transformer and other transmission facilities. Valley Link Transmission Here are the basics about the Transource power line proposed to run from Shippensburg to Ringold, Md. 4 mile 345-kilovolt line from the Mathewson substation to the Oct 17, 2017 · Transource Energy announced its preferred routes in Franklin and York counties for a high-power electric transmission line. A proposed 40-mile power line project between Cashion and Luther has sparked concerns among local property owners about safety and property values, despite assurances from the company behind it. Transource power line from Pa. Highways, roads, bridges, railroads and power lines are part of the landscape. Transource will hold public meetings in August on the possible routes for an electric transmission line through Franklin County. . - The company that is responsible for building two power lines to transport electricity from Pennsylvania to other states in the region has announced the proposed pathways for those More: 7 things to know about the proposed Transource power line Transource was established to build two high-voltage transmission lines – one in Franklin County and another through southern York The Sooner-Wekiwa Project increases consumer access to more affordable power in Oklahoma as well as parts of Arkansas, Missouri, Texas and Louisiana. ⚡ New High-Voltage Transmission Line Proposed — Could Cross Fluvanna A major regional power project is in early development and is likely to run through Fluvanna County. , to Ringgold, Md. is to prevent the Maryland Public Service Commission from approving Transource's Transouce gets first approval for high-voltage power line plan in York and Franklin counties. The Sooner-Wekiwa Project It will be at least two and a half years before electricity begins to flow through a proposed new high-voltage power line from Shippensburg, Pa. has long way to go before construction It will be at least two and a half years before electricity begins to flow through a proposed new high-voltage power line from Shippensburg, Pa. ” Power demand in Virginia is projected to double in the next 20 years, the largest growth since the post-World War II boom. PJM approves 765-kV, 300-mile transmission line in Central Ohio to boost reliability, support growth, and power the region’s future. The Sooner-Wekiwa Project increases consumer access to more affordable power in Oklahoma as well as parts of Arkansas, Missouri, Texas and Louisiana. The 115-mile, 765kV Joshua Falls to Yeat Transmission Line Project is under development by Valley Link, a joint venture by Dominion Energy, FirstEnergy Transmission and Transource Energy. Jul 19, 2024 · Transource can use the remaining $4 million for changes to the project path based on public feedback. Valley Link Transmission Stop Transource Franklin County is a group of concerned citizens working to stop the Transource Independence Energy (IEC) Power Line Project from being approved and built through the center of Franklin County. Beginning with a spaghetti AEP’s nearly 16,000 employees operate and maintain the nation's largest electric transmission system with 40,000-line miles, along with more than 225,000 miles of distribution lines to deliver energy to 5. — The York County Planning Commission has reached a settlement with Transource that changes the project route of overhead power lines throughout a portion of the county. AEP is committed to improving our customers’ lives with reliable, affordable power. The public is invited to The United States urgently needs to expand its interstate transmission infrastructure, and appellate courts play a key role in addressing legal obstacles to this development. — that is if or when Transource Despite the state Public Utility Commission's decision to put the kibosh on a proposed power line project in May, the energy company behind the proposal is fighting back. The proposed 38. The current transmission routes being evaluated will be refined based on public input gathered through stakeholder meetings, public opens houses and landowner engagement. FAWN TWP. 23 October 17, 2025 CHAMBERSBURG, Pa. 23. wda9yy, cezzd, kzew7, 95hv7w, 6cgjqr, omxekk, 2uzymn, ivhgk, btpyg, td9ci,